Home or business Triatomic Oxygen treatments may require a pre-treatment assessment. This entails assessing the extent of the odor and determining the appropriate dosing and time required for the treatment.

On the day of the treatment we arrive at the pre-arranged time to setup our equipment which consists primarily of Triatomic Oxygen generators and circulating fans. These are distributed throughout the home or business to maximize the distribution of Triatomic Oxygen and focus on any problem areas.

We ensure that Triatomic Oxygen is distributed throughout the ventilation system to enhance distribution, but also to ensure any chemicals and microorganisms in the ductwork are broken down or eliminated. Note, this process does not remove the dust or particles that a professional duct cleaning operation would.

Prior to initiating the TOST process we ensure that all people and pets are removed from the home or business. Fish do not have to be removed from the treatment area. Plants are removed from the area or contained in plastic to ensure they are not exposed to Triatomic Oxygen. We then start the equipment, exit and secure the building.

During the TOST we post signs at all entrances to ensure nobody enters the home or business. The signs have our emergency contact number should someone need to enter the home or business.

When we return to the home or business we enter the treatment area with a breathing apparatus to terminate the process, open windows and use the fans to vent the remaining ozonated air and replace it with fresh air. It takes from a half an hour to one hour to replace the air with fresh air. A sensitive Triatomic Oxygen detector is used to confirm that the Triatomic Oxygen levels are at ambient levels, which is below 0.05 PPM. Upon confirmation, people and pets are allowed back into the home or business. We then remove our equipment. A clean, fresh smell like that of laundry dried outside will be noticeable for roughly 12 hours then there will be no odors whatsoever.

The total time required for this process is 4 to 8 hours depending on the extent of the odor problem and the design of the premises.

Share